Aim:
To communicate the participative process between the Mattress Factory and artist that brings about the final creation and installation of an artwork.
Concept:
Visually illustrate the collaborative effort that makes possible the production and installation of an artist’s work at the MF. It is envisaged that a greater understanding of the support offered by the MF, to artists during the creative process, will give further value to and appreciation of the exhibited pieces (See figure 2).
Figure 2: brainstorming concept 2
Physical implementation of the Wayfinding Signs:
- Main exhibition space beside reception
- Inside the Elevator
- Relevant sign on each floor
Physical implementation of the Location (world map) Poster and Artist’s Process Poster
- Reception
- Elevator
Physical implementation of the Stickers:
- Interface Staff to distribute
- Patrons to wear
Verbal Scripts:
- Welcome Script that focuses on concise and significant exhibition information. This information will augment the wayfinding signage.
- Interface Staff Scripts to expand on the Artistic Process Poster (actual process) and sticker (artist information) when asked by patrons
Details:
- To design information that communicates how an art installation came to realization and how patrons may interact or behave within an exhibition space.
- Design with visual icons and illustrative information.
- Keep a consistency between the poster, stickers and exhibition information.
For Further Development:
- Design a welcome script.
- Design a MF sticker.
- Design a poster that supports the concepts voiced and visualized by the welcome script and sticker.
- Develop the concept of many hands and possibly communicate how many staff were involved, how long the process was and how many materials were involved. *We need to determine if this information is known or obtainable.
Material considerations:
- How many different types of sticker should be designed.
- How will the exhibition information be displayed?
Item 01 – Wayfinding
Build customer expectations via the simple and specific use of portable signage that is informative and relevant to current and permanent exhibitions.
- Create a large sign displaying information for each floor at the entrance
- Create a summary of the above information in the elevator
- Place the above information on each individual floor (5 levels)
- Revise the welcome script so that important information is highlighted.
Figure 3: exploration of item 1
Item 02 – Artistic Process
To be developed from Renna’s blueprint of the artist’s experience with the MF.


0 responses so far ↓